Contradictions review

Where do the budget and the documents contradict each other?

Axiora compares the Architecture budget against the drawings, the technical specifications and the design report. It detects what does not match and states which drawing, page or row each figure is on.

Valid for Architecture only. In beta with early adopters; it will be offered with credit packages.

What you need

  • Budget in ExcelRequired
  • DrawingsOptional
  • Technical specificationsOptional
  • Design reportOptional
  • BIM model (IFC or RVT)Optional

Example findings

  • Different dimensionWindow V-03: 1.20 × 1.10 m on the drawing, 1.20 × 1.50 m in the budget
  • Different codeDoor P-04: 04.17.04 in the budget, 04.17.05 in the specs

Illustrative data

What this review answers

Contradictions

Where do the budget and the documents contradict each other?

Detects dimensions, codes, titles or units that do not match, and states which drawing, page or row each figure is on.

Budget vs. documents

What does not matchWhat each source says
Different dimensionWindow V-03
  • Drawing A-305 · window schedule1.20 × 1.10 m
  • Budget · row 841.20 × 1.50 m
  • Specs · p. 961.20 × 1.50 m
No specificationDrywall suspended ceiling
  • Budget · row 3104.03.02
  • Specsnot found
Different codeDoor P-04
  • Budget · row 5804.17.04
  • Specs · p. 11204.17.05
Different unitPainted skirting
  • Budget · row 26m²
  • Specs · p. 61m
Different roomWindow V-05
  • A-308 · window scheduleArchive
  • A-303 · finishes scheduleStore
Illustrative example

This is what a review looks like

Every finding is located on the drawing where it appears, and your team approves or dismisses it.

Budget vs. documentation

Architecture · each line item against the design report, specs and drawings

7 to approve

  • Line items reviewed128
  • Consistent74
  • Missing information31
  • Missing info + different value9
  • Different value14
ItemDescription per budgetReportSpecsDrawingsFindingApproval
Porcelain skirting tile 60×120 t=8 mmm²Not statedDiffersDiffersMissing info + different valueTo approve
Flush door P-02eaNot statedPartialDiffersMissing info + different valueTo approve
Sliding window V-03eaNot statedMatchesDiffersDifferent valueTo approve
Drywall suspended ceilingm²Not statedNot statedMatchesMissing informationTo approve
Porcelain floor tile 60×60m²MatchesMatchesMatchesConsistent—

Try it: pick a finding, open it on the drawing and approve it.Illustrative example

What it reviews

Dimensions
Sizes and thicknesses that change between the budget, the drawings and the specifications.
Codes and titles
Line items that appear with a different code or a different name in the documents.
Units
Line items measured in one unit in the budget and another in the specifications.
Line items with no specification
Budget line items that do not appear in the technical specifications.
Rooms
Joinery that the window schedule and the finishes schedule place in different rooms.
Location and approval
Each contradiction opens on the sheet and page where it appears, and your team approves or dismisses it.

How it works

  1. 01

    Axiora reads and classifies the information

    It identifies the budget line items and what the drawings, the technical specifications and the design report call for.

  2. 02

    Axiora compares every source

    It relates each line item to its documents and detects what does not match, with its location.

  3. 03

    Approve the contradictions

    Open each one on the drawing where it appears and approve or dismiss it with your team.

Scope and limits

  • A contradiction does not say which source is correct. Your team decides that.
  • The review depends on what the documents allow it to read; scanned drawings can limit coverage.
  • It is not a code-compliance review.

Review your budget with evidence, not just with assumptions.

We show you how Axiora checks a budget against the BIM model, the drawings and the specifications.