Skip to content
Back to home

Possible omissions review

Is there anything the project calls for that is not in your budget?

Axiora cross-checks the Architecture budget against the drawings, the technical specifications and the design report, with or without a BIM model. It flags what the project calls for and no line item covers, with its source, so your team can confirm whether it is really missing.

Valid for Architecture only. In beta with early adopters; it will be offered with credit packages.

What you need

  • Budget in ExcelRequired
  • DrawingsOptional
  • Technical specificationsOptional
  • Design reportOptional
  • BIM model (IFC or RVT)Optional

Example findings

  • Possible omissionAluminium trim on edges, called for on drawing A-301, with no line item
  • Possible omissionGranite sill, called for in the window schedule, with no line item

Illustrative data

What this review answers

Possible omissions

Is there anything the project calls for that is not in your budget?

Flags what appears in the project with no line item covering it, with its source, so your team can confirm whether it is really missing.

The project against the budget6 requirements reviewed

What the project calls forBudget
Porcelain skirting tileDrawing A-30104.08.03
Aluminium trim on edgesDrawing A-301 · legend ZP-01no line item
Flush door P-02Door schedule04.17.02
Granite window sillWindow scheduleno line item
Latex paint on wallsSpecs · p. 7404.12.01
Door floor stopsDoor scheduleno line item

3 possible omissions for your team to confirm

Illustrative example

This is what a review looks like

Every finding is located on the drawing where it appears, and your team approves or dismisses it.

Budget vs. documentation

Architecture · each line item against the design report, specs and drawings

7 to approve

What the project calls for and no line item covers. Your team confirms whether it is really missing.

IDWhat the project calls forBudgetApproval
Aluminium trim on skirting edgesSheet A-301 · legend ZP-01no line itemTo approve
Granite sill on windowsSheet A-305 · window scheduleno line itemTo approve
Floor stops on doorsSheet A-401 · door scheduleno line itemTo approve

Try it: pick a finding, open it on the drawing and approve it.Illustrative example

What it reviews

What no line item covers
What the drawings, the specifications or the design report call for and no line item covers.
Schedule and legend codes
That every code in the door, window and finishes schedules has its line item.
Location on the drawing
Each possible omission opens on the sheet and page where it appears, with the citation marked.
Your team’s approval
Your team approves or dismisses each possible omission. The decision is theirs.

How it works

  1. 01

    Axiora reads and classifies the information

    It identifies the budget line items and what the drawings, the technical specifications and the design report call for.

  2. 02

    Axiora looks for what is missing

    It relates each line item to what the documents say and looks for requirements that no line item covers.

  3. 03

    Approve the possible omissions

    Open each one on the drawing where it appears and approve or dismiss it with your team.

Scope and limits

  • Without a BIM model no quantities are compared: the review focuses on descriptions, characteristics and requirements.
  • The absence of a textual match does not confirm an omission: an item may sit inside a composite line item.
  • The review depends on what the documents allow it to read; scanned drawings can limit coverage.

Review your budget with evidence, not just with assumptions.

We show you how Axiora checks a budget against the BIM model, the drawings and the specifications.